Installation Of The Positive Suction Head - Pentair CPS3-10 MULTINOX VE+ 4-120 Instructions De Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 49

8.3 INSTALLATION OF THE POSITIVE SUCTION HEAD

1) Basin or tank
2) Float
3) Shut-off valve
4) Outlet tubing
For the installation of the positive suction head, ensure the correct inclination of the suction piping until the air present in the tubing
can exit the outlet tubing.
5) Tank/autoclave membrane (8 l/min)
6) Gauge
7) Pressure transducer
8) Flexible tube
9) Non return valve
10) Filter
11) Motor pump complete with inverter
EN
43

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cps3-10 multinox ve+ 4-30Cps3-10 multinox ve+ 4-50Cps3-10 multinox ve+ 4-70Cps3-10 multinox ve+ 4-90Cps3-10 multinox ve+ 6-30Cps3-10 multinox ve+ 6-50 ... Afficher tout

Table des Matières