Pre-Installation Requirements - glass 1989 ANANDA STEAM Manuel D'installation, D'utilisation Et De Maintenance

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Read the manual carefully in all its
parts before using the product.
consultation.
remain unchanged.
use for which it has been designed. The
issued at the time of testing.
itself.
clearing detergents, etc..
cabin with water that is too hot. Use water
health status
inflammations, infectious diseases,
to dissociate the oil itself.
consult a doctor before using the
consult a doctor before using the
or medicines before and during the
unconsciousness.
instruction concerning use of the
of misuse.
All measurements are in mm.
PRE-INSTALLATION
REQUIREMENTS
max 60°C
C.P.
To make the electrical connection to
diameter of 2.5 mm².
When making the connection to the
suitable for 220/240 V 16 A.
differential thermal breaker.
meeting the relevant standards.
GROUNDWIRE.
The ground wire must be connected
EQUIPOTENTIAL CONNECTION.
The
following
accessories
supplied by the manufacturer) are
11
swivel joint.
ROUTINE AND
SPECIAL MAINTENANCE
To clean, see the "Cleaning and
Maintenance
Use
soft
cloths
substances, alcohol, acids for domestic
use, acetone or other solvents that can
damage the surface.
usea lemon juice.
Special maintenance must be carried
In case of failures or malfunctioning of
rights. The manufacturer shall not be held
TROUBLESHOOTING
In the event of abnormalities run the
following checklist.
All
electrical
connection
must be performed by an electrical
installation technician.
- The switch is on.
(not
All hydraulic connection checkup
must be performed by a hydraulic
installation technician.
EN
and
neutral
non-
checkup

Publicité

Table des Matières
loading

Table des Matières