ADEO SCREEN CINEMA CURVED Manuel D'installation page 27

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8
FRAME ASSEMBLY SCREEN
Prepare the ladder or the scaffolding on the front of the screen, put the rolled fabric on the upper
profile of the screen and fixed to the profile with 3 elastics: 1 in the centre and 2 near the corners,
after that unroll the fabric.
POSITION THE FABRIC IN THE CENTRE OF THE HORIZONTAL PROFILE
Made by Adeo Screen Sp. Z o.o. (Poland) Specifications are subject to change without notice. E&OE
Doc: CINEMA CURVED Installation Manual rev2 |08.06.2017
Please verify that you are working with the latest revision of this document before specifying your screen.
Page 27

Publicité

Table des Matières
loading

Table des Matières