Installation; Harger Overall Dimensions; Wiring; Cable From The Public Ac Power Supply Network Or Generator - philippi ACE 12V/25A Manuel Utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. INSTALLATION

This paragraph deals with installation-related arrangements.
Installation and initial commissioning should be carried out by an electrician or professional installer in accordance
with the standards currently in force (for pleasure boats the applicable international standard is ISO13297).
The installer should familiarize himself with this operating manual and inform users of the instructions for use and
the safety warnings set out in the manual.
C
3.1.

HARGER OVERALL DIMENSIONS

Chargers ACE 12-25
Chargers ACE 12-40 et 24-20 - See appendix 4
Chargers ACE 12-60 et 24-30 - See appendix 5
W
3.2.
IRING
When connecting or disconnecting a cable, the charger's power supply must be off and the batteries electrically
insulated from the charger.
The references for additional supplies required for the appliance to operate efficiently are provided in the following
paragraphs : failure to comply with these provisions renders the warranty null and void.

3.2.1. Cable from the public AC power supply network or generator

Disconnect AC network before any wiring and connecting of the connector.
All ACE battery chargers can operate automatically and equally on single phase networks from 90 to 265VAC and
from 47 to 65Hz.
Generators
The philippi battery chargers are designed to operate from a generator.
Be careful : In some cases, the generators can produce high over voltages, in particular during starting
phase. Before connecting the charger, please check its compatibility with the characteristics of the
generator : power, voltage, overvoltage, frequency, current, etc.
It's highly advised to disconnect the charger from the AC network during the generator starting phase.
The rating of the upstream circuit-breakers should match the equipment's requirements.
Remarks :
The ACE chargers are working as soon as they are connected (connected and supplied AC network cable)
The ACE chargers are stopped as soon as they are not anymore under voltage (disconnected AC network cable or
circuit breaker of the installation in OFF position).
- See appendix 3
22

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Ace 12v/40aAce 12v/60aAce 24v/20aAce 24v/30a

Table des Matières