Open Expansion Tank System - Nordica ITALY TERMO BUILT-IN-DSA Manuel Utilisateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Make sure that there is adequate ventilation in the room where the appliance is to be installed, with particular attention to windows and
doors with tight closing (seal ropes).
Do not install the appliance in rooms containing collective ventilation ducts, hoods with or without extractor, type B gas appliances, heat
pumps, or other appliances that, operating at the same time, can put the room in depression (ref. UNI 10683 standard)
Make sure that the flue and the pipes to which the appliance will be connected are suitable for its operation. It is not allowed the
connection of various appliances to the same chimney.
The diameter of the opening for connection to the chimney must at least correspond to the diameter of the flue gas pipe. The opening
must be equipped with a wall connection for the insertion of the exhaust pipe and a rosette.
The unused flue gas exhaust stub pipe must be covered with its respective cap (see chapter DIMENISIONS).
The installation must be appropriate and has to allow the cleaning and maintenance of the product and the flue.
Before installation, accurately wash the pipes of the system in order to remove any residuals that could compromise the correct functioning
of the appliance.
IMPORTANT:
a) It would be appropriate to install an automatic or manual air valve to allow the air outlet from the plumbing system;
b) In case of water leaking, close the water supply and promptly warn the after sales technical service;
c) The system working pressure must periodically be checked.
d) If not using the boiler for a long period of time, it is recommended that the after sales technical service is contacted to carry out at least
the following operations:
• close the water taps of both the thermal system and the domestic hot water system;
• empty the thermal system and the domestic hot water system if there is risk of freezing.
The DsA thermo appliances, can be installed in both an OPEN expansion Tank system and a CLOSED expansion Tank system .
La NORDICA s.p.A. declines all responsibility for damage to things and/or persons caused by the system. In addition, it is
not responsible for any product modified without authorisation and even less for the use of non original spare parts. Your
regular local chimney sweep must be informed about the installation of the appliance so that he can check the correct connection
to the chimney.

OPEN EXPANsION TANk sYsTEM

It is COMPULsORY that the OPEN expansion Tank system is provided with:
1. OPEN EXPANsION Tank: which has a capacity of 10% of total water content of thermo-product and of the installation. This is installed at
the highest point of the system, at least 2 m over the radiator that is at the highest level.
2. sAFETY PIPE : that connects through the shortest way, without descending or siphoning parts, the delivery of thermo-product to the
upper side of open expansion tank. ATTENTION: The inside diameter of the supply pipe which connects the thermoproduct with the
open expansion vessel must be equal to the internal diameter of the supply junction present in the thermoproduct. The above mentioned
connection pipe must be without siphoning parts.
3. LOAD PIPE : which connects the bottom of open expansion tank with the return pipe of installation. The minimum diameter must be ¾" gas.
All those parts must no have for any reason meditate intercept bodies that could accidentally exclude them and must be placed in rooms
which are protected from frost. On the contrary, if they freeze, the boiler body could break or even explode. In case of frost placing it will
be right to add a proper percentage of antifreeze liquid to the water of installation in order to delete the whole problem. In no way there
must be water circulation in the open expansion tank between the safety and loading pipe. This would cause the water oxygenation and
the consequent corrosion of thermo-product and installation in a very short time.
4. AUTOMATIC THERMAL DIsCHARgE VALVE DsA which is a further positive safety that prevents the boiling even when electric energy is
missing. It is made by a valve cover like a pressure safety valve which differs from it as it opens by reaching a pre-calibrated temperature
(normally at 94 – 95°C) and unload hot water from the installation delivery. This will be replaced with as much cold water coming from the
open expansion tank loading pipe of open tank by draining away the excessive heat.
5. sAFETY VALVE FROM 1,5 bar: maximum operation pressure allowed for the system is 1,5 bar (equal to 15 m of the water column). Higher
pressures can cause deformation and breakage of the boiler body.
6. sAFETY DEVICEs envisioned by Regulations in vigour.
7. CIRCULATION PUMP : . It would be better to install it on the return in order to avoid that it could disconnect itself at very high water
temperatures but checking that it does not drive water in the open expansion tank otherwise it should cause a continuous water oxygenation
with consequent, fast corrosion of boiler body. It must be not to avoid a forced circulation in the open expansion tank. Furthermore it must
be electrically connected to a thermostat or a electronic control unit that can be purchased with the thermo-fireplace as OPTIONAL part.
8. ANTI-CONDENsATION MIXINg VALVE – (see chapter)
ATTENTION: temperature safety sensors must be in place on the machine or at a distance no greater than 30 cm from the flow
connection of the thermo-product. Whenever the thermo products lack a device, those missing can be installed on the thermo
product flow pipe, within a distance no greater than 1m from the thermo product. All those parts must no have for any reason
meditate intercept bodies that could accidentally exclude them and must be placed in rooms which are protected from frost. On
the contrary, if they freeze, the boiler body could break or even explode.
ATTENTION: For no reason must the fire be ignited before the system has been completely filled with water; doing this
would lead to serious damage of the entire structure. The system must be filled by means of the loading pipe directly from the
open tank in a way to prevent an excessive pressure of the water network deforming the body of the thermo heating stove.
The system must be kept constantly full of water even during the periods when the use of the thermo-heating stove is not requested.
During the winter, inactivity must be faced with the addition of antifreeze.
ENgLIsH
25

Publicité

Table des Matières
loading

Table des Matières