Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1

3 Installation

Package Contents
* Cable type L1 +A3 : used to connect Keor LP , it is inclueded only in the references 310958,310960,310961
* Cable type L2 +A2 : used to connect Daker DK, it is included only in the references 310959,310961
Wiring installation guide
CAUTION
Only a licensed and expert electrician is authorized to install the Battery Charger.
Picture 1
Picture 2
Make sure +/- wires position is correct (not reverse no short circuit).
CAUTION : tighten screws and SELECT THE RIGHT OUTPUT VOLTAGE.
CAUTION : fix L1/L2 to the charger box through the cable ties (A4).
CAUTION : Assembly the terminal cover and fix it to the charger box by screw (picture 3).
External Charger 1-3 kVA
Picture 3
1. Switch off all the power sources that supply
UPS, battery banks and chargers. Ensure that
the Battery Charger is unplugged.
2. Turn off the battery banks breakers.
3. Remove the terminal cover by means of a
screwdriver (picture 1).
4. Connect the battery cables to the battery
box terminal (picture 2).
11

Publicité

Table des Matières
loading

Table des Matières