inus UB-7035R Mode D'emploi page 17

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
Connecting the water hose and grounding wire
Water tank
(1/2'', 3/8'')
T-valve
KIWA Certification Adapter - Check Valve (optional)
Trial operation
1. Preparation
Plug the power cord into the outlet. Press "BIDET" or "CLEANSING", then water tank will be filled. Within 30 seconds after
the water tank has filled up, you will hear a long buzzer sound.
2. Checking all functions
Cover the toilet bowl using the plastic wrapping sheet of the unit to prevent water from being sprayed out of the toilet.
Then check for all the functions described in this manual.
3. During trial operation there are possibilities of remaining water coming out from the unit while
heating.
Close the shutoff valve by turning clockwise.
Flush the water tank completely to empty.
Disconnect the existing water supply hose from the shutoff valve.
If required, connect the KIWA Certification Adapter
Check Valve as shown on the picture.
Install the T-valve as shown on the picture.
Connect the existing water supply hose from the tank to the T-valve.
Connect the new flexible hose from the T-valve to the main appliance.
Open the shutoff valve by turning counter clockwise.
Check for any water leaking or dripping.
If the flexible hose is too long, it can be cut easily
to the required length.
Main unit
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ub-7235Ub-7000Ub-7035r-rcUb-7235-rcUb-7000-rc

Table des Matières