Caution- For safety reasons, damaged supply cables must be replaced by the
manufacturer, its Customer Services department or a sufficiently qualified person.
Caution- Before carrying out any maintenance work, make sure that you switch
off the Zenia heater by pressing the main switch.
This unit is not suitable for use at altitudes above 2000 m. It may be installed in
Zone 2 according to DIN 57100/VDE 100 Part 701, i.e. directly next to the bathtub
or shower, but not over or inside these elements. An illustration is provided in the
installation instructions; however, this only applies in the case of a room with a
bathtub.
The installation must include an all-pole isolation device with a contact opening
width of at least 3 mm.
To guarantee the safety of the installation, you must:
-
Place objects (furniture, chairs, etc.) at least approx. 50 cm away from
the front of the radiator so that the air can circulate freely.
-
Make sure that the underside of the radiator is at least 10 to 15 cm
above the floor.
-
Leave at least 10 cm between the top of the radiator and a shelf.
-
Use suitable screws based on the nature of the wall or in-wall
construction.
-
Make sure that the radiator is not exposed to high or sustained humidity
levels.
Caution - To avoid risk of accidental reset of the protection temperature limiter,
the device must not be powered by an external switching device (timer) or
connected to a circuit that is periodically turned on and off by a device..

Commissioning

Risk of electric shock
Installation and commissioning may only be performed by the specialist
company.
After installation is complete and the main switch has been switched on, the specialist
should briefly check that the 4 functions start when the relevant symbol is pressed on the
control panel (is there warm air in the outlet area? Does the heated glass door heat up?).
After this, we recommend that you or the specialist company adapt the settings to your
individual needs via the Zehnder Connect app (e.g. set running times for the functions,
configure the daily and weekly programmes).