Télécharger Imprimer la page

HERKULES SHZ 125/250 Mode D'emploi page 18

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 21
Anleitung SHZ 125-250 Herkules
GB
ced at a qualified workshop. When the cable is fit-
ted it is imperative that the switch-off weight (12),
for reliable limit stopping, is not forgotten.
3.
You should apply a little oil to the bearing of the
return pulley (14) at regular intervals.
4.
Check the smooth running of all the mechanical
parts of the winch with the equipment switched
off.
5.
The device must be inspected by a qualified per-
son at least once a year. The results of the ins-
pection must be recorded in an inspection book.
18
12.02.2004
11:16 Uhr
Seite 18

Publicité

loading

Ce manuel est également adapté pour:

113 2249