LEGRAND 310958 Manuel D'installation page 12

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
5. Connect the battery charger to the battery bank through the DC cable L1 or L2 (picture 4,5).
Picture 4 - KEOR LP
6. Ensure the installation is safe for the final user applying to the battery cabinet terminal block
insulating cover and cables glands.
7. Plug the power cable to the AC mains socket.
8. Switch on the battery banks breakers.
9. Turn on the mains that supply UPS, battery banks and battery chargers.
CAUTION
Before to uninstall the battery charger switch off the mains and the battery banks and ensure
no dangerous voltage is present in the terminal block. No matter the charger is connected to
the utility or not, the output may have electricity
12
3 Installation
Picture 5 - DAKER DK

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

310959310960310961

Table des Matières