Preparing For Operation - Warmtech CACG10KW Traduction Des Instructions D'origine

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. INSTALLATION
2.1 Connect the heater to a suitable electric socket /220-240V~ 50Hz
2.2 Make sure that the machine is properly earthed.
2.3 Connect the gas supply hose to the pressure regulator and connect the regulator
to a suitable PROPANE cylinder.
2.4 Open the tap of the cylinder and check the supply hose and fittings for gas leak.
For this operation it is recommended to use an approved leak detector.
2.5 NEVER USE NAKED FLAMES.
2.6 For automatic appliances, connect the room thermostat to the socket on the
appliance and adjust it to the required temperature.
3. INSTRUCTION FOR USE

PREPARING FOR OPERATION

1. Check the heater for possible shipping damage.
2. Connect the hose and regulator assembly to the PROPANE cylinder by rotating
the nut counterclockwise into the PROPANE cylinder's valve outlet and securely
tighten.
3. Open the cylinder's gas valve and check all gas connections with a soap and
water solution.
4. Connect power cord to well-grounded 220-240V~50Hz source of power.
3.1 IGNITION / Manual ignition
a. Turn the power switch to position I and check that the fan starts running correctly.
(Fig 2.)
b. Push the gas valve button and push repeatedly the piezoelectric lighter until the
flame lights up. (Fig 3-4)
Figure.2

Publicité

Table des Matières
loading

Produits Connexes pour Warmtech CACG10KW

Ce manuel est également adapté pour:

Cacg30kw

Table des Matières