People working in wastewater systems must be vaccinated
against the pathogens that may be found there. For the sake of
your health, be sure to pay meticulous attention to cleanliness
wherever you are working.
Make sure that there are no toxic gases in the working area.
Observe the health and safety at work regulations and make
sure that a first-aid kit is to hand.
In some cases, the pump and the pumping medium may be hot
and could cause burns.
For installations in areas subject to explosion hazards, special
regulations apply!

AREAS OF APPLICATION

The ready to connect Compli sewage lifting stations are TÜV
certified and are suitable for the disposal of wastewater from
toilets and urinals, and domestic wastewater containing the
usual impurities.
The units have a level controller that switches the pump on and
off depending on the level of the water. An integrated alarm
system beeps if there is a malfunction, even if this is only tem-
porary.
If the pump overheats, the motor cuts out due to the winding
thermostat. After the thermostat has switched off the system,
pull out the mains plug before remedying the fault, since the
device can switch itself on again automatically if the power is
still connected. A direct malfunction message is not generated.
The tanks can withstand submersion to a depth of not more
than 2 m of water and a submersion period of up to 7 days.
The control unit cannot withstand submersion, but is splash-
proof in accordance with IP 44.
If installed in Compliance with the regulations and used prop-
erly, then this control unit meets the protective requirements
of the EMC Directive 2014/30/EU and is suitable for domestic
use and connection to a power supply from the grid. When
connected to an industrial mains within an industrial operation
with power supply provided by a company-own high-voltage
transformer, insufficient immunity to interference has to be
expected.
When using the pumps, the relevant national laws, regulations
and stipulations must be adhered to, for example:
• Sewage disposal units for building and ground drainage
systems (e.g. EN 12050 and 12056 in Europe)
• Installation of low voltage systems (e.g. VDE 0100 in Ger-
many)
• Safety and working materials (e.g., BetrSichV and BGR 500
in Germany)
• Safety in wastewater systems (e.g., GUV-V C5, GUV-R 104
and GUV-R 126 in Germany)
• Electrical systems and operating resources (e.g., GUV-V A3
in Germany)
• Explosion protection EN 60079-0,
EN 60079-1, EN 60079-14, EN 60079-17 and EN 1127-1

Scope of supply

• Tank with pump(s)
• Clamp flange / socket for inlet
• Reducing adapter for inlet DN 150 to DN 100
• Slip-on socket pipe for ventilation pipe
10
• Connection flange for pressure pipe
• Reducing adapter for pressure pipe DN 100 to DN 80
• Non-return valve for the pressure pipe (Compli 100, 300, 500,
and 1000)
• Flexible connection with hose clamps for the pressure pipe
• Plug-in seal(s) for the diaphragm hand pump or additional
inlet DN 50
• Fixing materials for tank
• Control
NOTICE! Transport lock = protection against buoyan-
cy of the container
Mode of operation: intermittent operation S3; see "Technical
Data".
INSTALLATION
The pump must be installed so that it is buoyancy-proof and
free-standing. At least 60 cm free working space must be pro-
vided around and above the parts that require access for op-
eration or maintenance.
Ventilation: The ventilation pipe must be vented above roof level.
Inlet: A wastewater sluice valve must be installed in the inlet at
the front of the tank.
Pressure pipe: A further wastewater sluice valve must be in-
stalled behind the non-return valve in the pressure pipe. If the
non-return valve is not included in the scope of delivery of the
pumping unit, then an EN certified swing-type check valve
must be fitted.
The pressure pipe must be laid in a loop above the local backup
level.
NOTICE! The pressure pipe of the Compli 300/400 must be
supported or suspended by the customer. The weight must not
rest on the system.
A pump sump must be provided to facilitate the disposal of wa-
ter from the pump installation area.
NOTICE! All bolts that are used for fixing individual compo-
nents to the tank should be tightened with a torque of no more
than 6 Nm.
Installing the tank
Compli 300. Close the sluice valve in the inlet (accessory) to
prevent any leakage of water during the installation work.
Select the DN 100 inlet you wish to use and open this inlet at
the side or at the top at the markings using a 102 Øhole saw or
a jigsaw. Then deburr the edges. Fix the enclosed clamp flange
loosely to the inlet with the hexagon screws.
Take the brackets that are used to fix the unit in place and
screw them to the tank. Then take the unit with the clamp
flange and push it onto the inlet pipe as far as it will go.
Mark the positions of the wall plugs on the floor, then drill the
holes and push in the wall plugs.
Now the clamp flange can be tightened and the unit can be an-
chored to the floor using the wood screws and shims.
Compli 400. Close the sluice valve in the inlet (accessory) to
prevent any leakage of water during the installation work.
The inlet height is continuously adjustable, see technical data.