Xylem LOWARA Resiboost MMW09 Manuel D'installation, D'utilisation Et D'entretien page 29

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
Number
Component
level control
sensor)
4
Electric pump
bleed / priming
cap
5
Vacuum pres-
sure gauge
6
Filter
7
Non-return
valve with filter
(foot valve)
8
Pressure gauge
9
Pressure trans-
ducer
10
Non-return
valve
11
Gate valve
12
Diaphragm
tank, minimum
8 liters
13
Converter
14
Converter pow-
er panel
15
Power panel
with high sensi-
tivity differential
switch (30 mA).
See
Electrical
requirements
(page 27).
16
Storage tank
17
Float switch
18
Filter for motor
cable over 30 m
in length.
4.3.3 Components for correct installations
with submerged electric pumps
See
Figure 26
(page 260),
Figure 28
(page 262), and
Number
Component
1
Electric pump
2
Cable clamp
3
Motor power ca-
ble
4
Level probes to
prevent dry run-
ning (or other
level control
sensor)
Included in the
kit
Figure 27
(page 261),
Figure 29
(page 263).
Included in the
kit
Number
Component
5
Mounting brack-
et
6
Non-return
valve
7
Pressure gauge
8
Pressure trans-
ducer
9
Gate valve
10
Diaphragm
tank, minimum
8 liters
11
QCL5 control
board for level
probes
12
Filter for motor
cable over 30 m
in length.
13
Converter
14
Converter pow-
er panel
15
Delivery pipe
16
Electric pump
bleed / priming
cap
17
PTC or PT1000
(available only
with some mod-
els of the sub-
merged motor)
18
Power panel
with high sensi-
tivity differential
switch (30 mA).
See
Electrical
requirements
(page 27).
19
Quick coupling
(provided for
fastening the
converter on the
pump)
The following notes and recommendations refer to
Figure 26
(page 260),
Figure 27
28
(page 262), and
Figure 29
A. Distance between the clamps that secure the
drop cable to the delivery pipe.
B. Distance from the bottom of the well to the elec-
tric pump.
Recommendations:
• Non-return valve at 10 m distance from the deliv-
ery flange, plus an additional non-return valve
every 30-50 m of piping.
• Secure the drop cable to the pipe every 2 to 3
metres of piping.
• Make sure the electric pump is installed at a safe
distance from the bottom of the well.
en - Original instructions
Included in the
kit
(page 261),
Figure
(page 263).
29

Publicité

Table des Matières
loading

Table des Matières