Installing The Appliance - AEG DDLE LCD 18 Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31
Fitting the cable grommet
» Fit the cable grommet. In the case of a connect-
ing cable > 6 mm², enlarge the hole in the cable
grommet.
Making the water connection
Material losses
!
Carry out all water connection and installation work
in accordance with regulations.
» Seal and insert the twin connectors.
Material losses
!
Never use the shut-off valve in the cold water inlet
to reduce the flow rate.
Preparing the back panel
Material losses
!
If you break out the wrong knock-out by mistake, you
should use a new back panel.
» Break out the cable grommet knock-out in the
back panel. Deburr the sharp edges with a file if
necessary.
Installation - for qualified contractors

Installing the appliance

3
L3'
4
L2'
1
L1'
2
» Push the back panel over the threaded stud and the
cable grommet. Pull the cable grommet by the lock-
ing hooks into the back panel using pliers, until both
locking hooks audibly click into place.
» Remove the transport plugs from the water
connections.
» Press the back panel firmly into place and lock the
fixing toggle by turning it clockwise through 90°.
» Screw the water connection pipes with flat gaskets
on to the twin connectors.
Material losses
!
The strainer must be fitted for the appliance to func-
tion.
» When replacing an appliance, check whether
the strainer is installed (see chapter "Mainte-
nance").
Removing/replacing the flow limiter
Note
If you use a thermostatic valve, the flow limiter must
not be removed.
23

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ddle lcd 21Ddle lcd 24Ddle lcd 27

Table des Matières