Water Installation; Standard Installation - AEG DDLE LCD 18 Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31
Installation - for qualified contractors

9.2 Water installation

◦ A safety valve is not required.
» Flush the water line thoroughly.
» Ensure that the flow rate (see chapter "Specification /
Data table", On) for switching on the appliance is
achieved. If the flow rate is not achieved, remove the
flow limiter (see chapter "Installation / Removing the
flow limiter").
» Increase the mains water pressure if the required
flow rate is not achieved with the draw-off valve fully
opened.
Taps
Use appropriate pressure taps. Open taps are not per-
mitted.
Note
Never use the shut-off valve in the cold water inlet
to reduce the flow rate. It is intended to shut off the
appliance.
Permissible water pipe materials
◦ Cold water inlet pipe:
Galvanised steel pipe, stainless steel pipe, copper
pipe or plastic pipe
◦ DHW outlet pipe:
Stainless steel pipe, copper pipe or plastic pipe
Material losses
!
If plastic pipework systems are used, take into ac-
count the maximum inlet temperature and the max-
imum pressure (see chapter "Specification / Data
table").
Flexible water connection lines
» If the appliance is installed with flexible water con-
nection lines, ensure that the bayonet fittings of
the pipe bends do not become twisted inside the
appliance.
» Secure the back panel at the bottom with two addi-
tional screws.
10. Installation

10.1 Standard installation

◦ Electrical connection from above; installation on un-
finished walls
◦ Water connection, installation on unfinished walls
◦ DDLE LCD 18/21/24: Connected load 21 kW preset
For further installation options, see chapter "Installation
alternatives":
◦ Electrical connection from below on unfinished walls
◦ Electrical connection for finished walls
◦ Connecting a load shedding relay
◦ Undersink installation, water connections – from
above
◦ Water installation for finished walls
◦ Operation with preheated water
◦ Temperature limit
22
Opening the appliance
» Open the appliance by releasing the snap lock.
» Remove the back panel by pressing the two locking
hooks and pulling the lower part of the back panel
forwards.
Preparing the power cable
160
≥ 30
Fitting the wall mounting bracket
» Mark out the holes for drilling with the installation
template. If the appliance is to be installed with water
connections on finished walls, also mark out the fix-
ing holes on the lower part of the template.
» Drill the holes and secure the wall mounting bracket
with 2 screws and 2 rawl plugs (screws and rawl
plugs are part of the standard delivery).
» Fit the threaded stud provided.
» Mount the wall mounting bracket.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ddle lcd 21Ddle lcd 24Ddle lcd 27

Table des Matières