Technical Data; Fitting A Suction Pipe; Electrical Connections - Ergotools Pattfield E-GP 8030 Mode D'emploi D'origine

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
Anleitung_E_GP_8030_SPK7:_
Media which can be pumped:
For the pumping of clear water (fresh water), rain
water or mild suds/dirty water.
Please note that our equipment has not been
designed for use in commercial, trade or industrial
applications. Our warranty will be voided if the
machine is used in commercial, trade or industrial
businesses or for equivalent purposes.
Note: The equipment is not allowed to be used to
convey drinking water.
4. Operating instructions
Basically, we recommend the use of a prefilter and
an intake set with an intake hose, an intake strainer
and check valve in order to prevent long repriming
times and any unnecessary damage to the pump
caused by stones and hard foreign bodies.

5. Technical data

Mains supply:
Power rating:
Delivery rate max.
Delivery height max.
Delivery pressure max.
Suction height max.
Delivery and intake connection:
Water temperature max.
Protection type

6. Electrical connections

Connect the power cable to a 230 V ~ 50 Hz
earthed, 10 amp fuse minimum.
The appliance is switched on and off using the
integrated ON/OFF switch.
The motor is protected against overloading or
blocking by an integrated thermostat. In the event
of overheating, the thermostat switches off the
pump automatically. The pump will start up again
automatically after it has cooled down.
24.11.2009
10:41 Uhr
Seite 9

7. Fitting a suction pipe

Screw an intake hose (min. 3/4" plastic hose with
spiral reinforcement) either directly or with a
threaded nipple to the pumpʼs intake connection
(1" IG) (see Fig. 1/item 1).
The intake hose used should have an intake
valve. If the intake valve cannot be used, a check
valve should be installed in the intake line.
The intake hose should rise from the water pick-
up point to the pump. Always avoid laying the
intake line higher than the pump. Air bubbles in
the intake line delay and hinder suction.
The intake and pressure lines must be attached in
such a way that they do not place the pump under
any mechanical strain.
The intake valve should be so far immersed in the
water that the pump cannot run dry even if the
water level falls.
If the intake line is not air-tight, the intake of air
will hinder the intake of water.
Avoid drawing in foreign bodies (sand etc.).
If necessary, install a prefilter for this purpose.
230V ~ 50 Hz
8. Pressure line connection
800 W
The pressure line (should be at least 3/4") must
3000 l/h
be connected to the pumpʼs pressure line
36 m
connection (1" IG) either directly or via a threaded
nipple (see Fig. 1/item 2).
36 bar
A 1/2" pressure hose can also be used with the
8 m
appropriate screw connections, of course, but this
1" IG
will reduce the delivery rate.
All shut-off devices (spray nozzles, valves etc.) in
35°C
the pressure line must be fully opened when
IPX4
priming so that any air in the intake line can
escape.
9. Starting up
Set up the pump on flat and firm ground.
Attach the intake line ready for use.
Plug into the mains.
Fill the pump with water at the pressure
connection.
All shut-off devices in the pressure line (spray
nozzles, valves etc.) must be fully opened when
priming so that any air in the intake line can
escape.
Depending on the suction height and the amount
of air in the intake line, priming can take anywhere
between 30 seconds and 5 minutes. If it takes
longer than this, the pump should be refilled with
GB
9

Publicité

Table des Matières
loading

Produits Connexes pour Ergotools Pattfield E-GP 8030

Ce manuel est également adapté pour:

41.801.41

Table des Matières