Carrier KJR-120C/TF-E Manuel D'utilisation page 10

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 266
G B
3. INSTALLATION METHOD
5. Battery installation
Fig 3-7
Put the battery into the installationsite and make sure the positive side of the battery
is in accordance with the positive side of installationsite.(See Fig.3-7)
Please set the time corrected on the first time operation. Batteries in the wire
controller can timing under power failure which ensure the time keep right. When
the power restores, if the time displayed is not correct, it means the battery is dead
and replace the battery.
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kjr-120c/tf-gKjr-120c/tf-hKjr-120c/tf-iKjr-120c/tf-j

Table des Matières