G-U SECURY 19 EK Notice De Montage page 53

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Check through actuation of the inside and outside lever handle whether
the handles have function (idle).
In the decoupled status (no control signal), couple in the inside and
outside lever handle using the locking cylinder / cylinder cam.
Check whether all latchbolts are completely pulled back when both the
inside and the outside lever handle are actuated.
Check whether the inside and outside lever handles can be pressed down
easily.
Release the lever handles so they return to the initial position.
Check whether the three latchbolts are projected automatically and
completely through pressing on the trigger lever.
Make sure that all three latchbolts are completely projected.
Check through pressing on the latchbolts (max. 20 N) whether they are
secured against being forced back.
Decouple the inside and outside lever handle again using the locking
cylinder / cylinder cam. The lever handles must have no function now
(idle).
Couple the inside and outside lever handle electrically.
Check whether all latchbolts are completely pulled back when both the
inside and the outside lever handle are actuated.
Now decouple electrically the inside and outside lever handle again. The
lever handles must have no function now (idle).
Separate the multi-point lock from the power circuit.
Operating current (fail-secure) version:
Check whether the inside and outside lever handles are decoupled (idle).
Quiescent current (fail-safe) version:
Check whether the inside and outside lever handle are coupled in.
Make sure that, after the test, all latchbolts are pulled back, i.e. all
latchbolts are in the initial position.
53

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Secury 19 ek evpSecury 19 sSecury 19 s evp

Table des Matières