Preparation Before Installation - Carrier KJR-120G1/TFBG-E Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 266
2. INSTALLATION ACCESSORY
Select the installation location
Don't install at the place where cover with heavy oil, vapor or sulfureted gas,
otherwise, this product would be deformed that would lead to system malfunction.

Preparation before installation

1. Please confirm that all the following parts you have been supply.
No.
Name
1
Wire controller
2
Installation and owner's manual
3
Screws
Wall plugs
4
5
Screws
Plastic screw bars
6
7
Battery
8
The connection cable
2. Prepare the following assemblies on the site.
No.
Name
1
Switch box
Wiring Tube(Insulating
2
Sleeve and Tightening
Screw)
Qty.
1
1
M4X20 (For Mounting on the Wall)
3
For Mounting on the Wall
3
2
M4X25 (For Mounting on switch box)
For fixing on switch box
2
1
6 meters(20 feet)(Optional)
1
Specification
Qty.(embeded
(only for reference)
into wall)
1
1
2
Remarks
Remarks
G B

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kjr-120g2/tfbg-e

Table des Matières