Disposal
Packaging and any parts that are not need-
ed should be recycled or disposed of prop-
erly. Observe local regulations.

Technical features

Operating pressure: max. 10 bar
Test pressure: 1.3 x operating pressure
Flow temperature: hot water up to 100°C
(212°F)
Installation
Preparatory activities
Check fasteners for damage.
Note the number of mounting points (see
Fig. A).
Number determined and checked on
vertical coring lightweight brick T14.
Requirement
VDI 6036 permissible when complying
with Appendix D. If necessary, install ad-
ditional slip and shift restraint (refer to
manufac-turer's documentation).
Note the position of mounting points (see
Fig. C).
When installing, only remove protective
packaging at the fastening and connection
points.
Assemble the radiators delivered in blocks
(see Fig. B)
Accessories per connection:
Item Group
1
Screw-in fitting M 27
2
Screw-in fitting with flange
3
Union nuts SW 30
4
Panel
Set individual blocks on a clean and level
base.
With an Allen key SW 12 screw the screw-in
fittings M 27 (1) on one of the blocks in and
tighten (tightening torque 40 Nm).
Put the screw-in fittings with flange (2) in
the union nuts SW 30 (3) and screw down
on the second block.
With an Allen key SW 12 tighten the screw-
in fittings with flange (2) (tightening
torque 40 Nm).
class 2
according
Number
2
2
2
2
Using a fork spanner SW 27 screw the union
nuts SW 30 (3) and the screw-in fittings to-
gether M 27 (1) (tightening torque 30 Nm).
In doing so, alternatingly tighten just 1–2
turns in each case to prevent the threaded
connection part from jamming.
Attach panels (4).
Transport radiator only in a standing posi-
tion.
Install built-into-wall brackets (see Fig. 1–8)
Observe submersible radiator-wall spacing
(WA) (see Fig. C).
In the event of a projection from the wall,
e.g. insulation material, the projecting
length of the built-into-wall bracket is re-
duced by the thickness of the projection (see
Fig. 4).
Prepare tools.
to
Drill holes. Note walling material.
Note: Brackets with lift restraints are installed
on top, outside and possibly additionally even-
ly spaced along the length.
Pre-install lift restraints.
Install built-into-wall brackets:
Note the orientation of the built-into-
wall bracket, slit to the top.
Make sure that the built-into-wall brack-
et's expansion zone is not completely
within a hollow space of the building
material used.
Align and secure the built-into-wall brack-
ets.
Shorten panel if required and attach with
the raw edge to the wall.
Attach rosette.
Install clamp (see Fig. 9–14).
Pre-install clamp.
Turn traverse holder by 90°.
Attach clamp on the radiator from behind
and from the front turn the traverse holder
back by 90°.
Align clamp and tighten (tightening torque
7 Nm).
Attach cover cap.
For BH 1050: Install spacers (see Fig. 15–16).
Depending on the installation situation,
shorten the spacer and apply the long or
short nut.