Installation Procedure - Gaggenau VK 414 610 Notice De Montage

Cuiseur vapeur
Masquer les pouces Voir aussi pour VK 414 610:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

For flush mounting:
2
According to the figure, create the drill hole Ø 1
(35 mm) for fixing in place the control knob in the
front side of the lower cabinet. A drilling template is
included for precise positioning of the drill hole.
For flush mounting:

Installation Procedure

Installation of control console
Note: Only install the appliance in conjunction with the
corresponding control console.
1
Remove the packaging of the control knobs and the
protective film from the light rings.
2
Open the cover of the terminal box on the control
console. Secure the mains connecting lead as
shown in the terminal diagram and secure it with
pull relief. Close the terminal box cover.
/
"
3
3
Hold the retaining plate against the front panel from
8
behind. Stick the control knobs into the holes from
the front and screw it tight from behind with the
nuts. Make sure that the control knobs are correctly
arranged.
4
Screw the control console tight to the retaining
plate using the nuts included.
I n s t a l la t i o n P r o c e d u r e
9

Publicité

Table des Matières
loading

Table des Matières