Din Rail Mounting - Acksys WLg-SWITCH Guide D'installation Rapide

Switch ethernet 8 ports durci administrable avec interface wifi
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

To remove the C-KEY, unscrew the two lateral screws, and then pull the
device upward, vertically. If needed, use the screwdriver as a lever, with the
help of the notches intended for this purpose at the base of the screw guides.
When installing a new C-KEY, be sure that the flattening looks to the rear of
the product, then carefully insert the device in the opening, vertically.

DIN RAIL MOUNTING

The WLg-SWITCH comes with a 35 mm DIN rail clip. To insert the product on
the rail, tilt slightly the device and pull it firmly upward to put the rail in
pressure on the lower slot of the clip, as shown on the picture below, and
then push the upper side of the clip onto the rail with a rotating movement.
To remove the product from the rail, proceed inversely in the same way: push
the device upward, and then, with a rotating movement, pull the upper side of
the clip out of the rail, then release the lower side of the clip.
PANNEL MOUNTING
An optional right-angle bracket is also available for panel mounting.
-7-

Publicité

Table des Matières
loading

Table des Matières