Fortress Building Products Al13 HOME Instructions D'installation page 12

Rampe d'aluminium
Masquer les pouces Voir aussi pour Al13 HOME:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 5.
Attach I-Support To Deck
1� Fasten I-Support to Deck Surface with the supplied Phillips
Head Wood Screw�
Tip: Pre-drill with a 1/16" [1.5mm] drill bit.
Fig. 1
OTP: TENSIONING CABLE
• Reference page 38 for tensioning steps�
OTP: ROUND ACCENT TOP RAIL (ATR)
Step 1.
Round ATR Spacers
1� Attach spacers using provided self-drilling screws with a
5/16" [8mm] nut driver, two screws per spacer� As shown in
Fig� 2�
• The Accent Top Rail Kit comes with 7 spacers in the 93�89"
[2385mm] kit, 6 spacers in the 69�89" [1775mm] kit and 14
spacers in the 189�78" [4826mm] kit�
• The spacers should be equally spaced along the length of the
rail, with no more then 14" [279�5mm] spacing between them�
As shown in Fig� 1�
• The end spacers should be placed as close to the end brackets
as possible�
12
AL
HOME VERTICAL CABLE INSTALLATION
13

Publicité

Table des Matières
loading

Table des Matières