• Now start the pulley system with
the remaining line between the
Slack-Ring just attached and the
Steel-Ring adjoined to the tree
sling at fixed-point 2.
• At first run the remaining line
through the Steel-Ring at fixed-
point 2 from the bottom up
(Fig. 8, 1).
• Continue by following the steps
shown in Fig. 8, 2–4.
• MAKE SURE THAT THE LINE IS
THREADED UNDERNEATH
THE PREVIOUS ONE.
single Slack-Ring
remaining line
about 1–2 m for the
pulley system
Fig. 7
Fig. 8
19
fixpoint 2