4. Setup
Measuring and base station
• Remove the protective lm from the display.
• Open the battery compartment on the back of the measuring
station and insert 2 AAA batteries, observing the correct
polarity.
• Open the battery compartment on the back of the base station
and insert 2 AAA batteries, observing the correct polarity.
• Then close the battery compartment cover.
Note
• Please remember, during commissioning, to always insert the
batteries into the measuring station rst.
5. Installation
Note - Installation
• We recommend initially positioning the base station and
measuring station at the preferred setup locations without
installing them and carrying out all the settings - as
described in 6. Operation.
• Do not install the station(s) until the settings are correct and
the radio connection is stable
Note
• The range of the radio transmission between the measuring
station and the base station is up to 50 m in unobstructed
areas.
• Before installing, make sure that the radio transmission is
not in uenced by interfering signals or obstacles such as
buildings, trees, vehicles, high-voltage power lines, etc.
• Before nal installation, make sure that there is su cient
reception between the desired installation locations.
• When installing the measuring station, take care to ensure
this is positioned so that it is protected from direct sunlight
and rain.
• The international standard height for measuring air
temperature is 1.25 m (4 ft) above ground.
4
Warning
• Buy special or suitable installation material from a specialist
dealer for wall-mounting.
• Ensure that you do not install any faulty or damaged parts.
• Never apply force during assembly. These can damage the
product.
• Before mounting, check that the wall you have chosen is
suitable for the weight to be mounted. Also make sure
that there are no electric, water, gas or other lines running
through the wall at the mounting site.
• Do not mount the product above locations where persons
might sit or stand.
6. Operation
Connection to the measuring station
• After the batteries are inserted, the base station automatically
searches for a connection to the measuring station and carries
out the initial setup routine.
Note
• Initial setup takes around 3 minutes.
• The radio symbol measuring station (4) ashes when
searching for a connection.
• Avoid any operation of the buttons during this time!
Otherwise, errors and inaccuracies may occur in the values
and their transmission.
• The process is nished as soon as the indoor and outdoor
measurement data are displayed.
Note - faulty transmission of the measured
values
• In some cases, interference caused by a WiFi network,
computer, TV, etc., for example, may cause the transmission
of measured values between the base and measuring
station to fail.
• If this happens, resynchronise the stations by brie y removing
the batteries from both stations and reinserting them.
• If the measured values are not transmitted again, replace the
batteries with new ones.
• If necessary, choose a new location for the base station to
avoid the possible interference signals in the future.
• The measuring station and base station must not be
positioned more than 50 metres apart.
• Stay at least 2.5 m away from interference