Installation; Hood Installation - Dcs 221712 Installation Guide

Table des Matières
Les langues disponibles

Les langues disponibles

INSTALLATION

HOOD INSTALLATION

1. Adjust chimney mounting structure to E + 3/8" dimension as determined in installation height
calculation on page 7. Use 2 screws per attachment leg, see Fig. 3.
2. To install Chimney Structure to ceiling, use a 10mm or adjustable wrench or flat head screwdriver.
a. Drill pilot holes into ceiling at fixing
points as determined in Step 6 under
Ceiling Preparation (Pg. 8).
b. Screw the 4 lag screws provided (see
Fig. 4, do not tighten completely).
c. Attach mounting structure to joists with
the 4 lag screws provided. (see Fig. 4,
keep 10" duct inside structure) .
ATTENTION: Junction Box on the chim
ney structure should be oriented to the
right side when facing the front of the
cooktop.
d. Tighten the 4 lag screws, see Fig. 4.
Fixing
point
Leg
screw
10" Duct
Ceiling
1/2" Conduit
Chimney
Structure
FIG.4
9
Attachment
Leg
Junction
Box
FIG.3

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Dcs ivs40Dcs ivs52

Table des Matières