DCS IVS40 Installation Guide page 12

Table des Matières
Les langues disponibles

Les langues disponibles

Downloaded from
www.Manualslib.com
INSTALLATION
9.
Ducting: There should be no more than 1"
gap between canopy transition and house
ducting. Adjust starting collar over both
ducts. Tighten collar. Fasten duct with
screws and tape per code. Screws must not
hamper the damper. See Fig. 9.
INTEGRAL VENTILATOR INSTALLATION
(see Fig. 10 to 11)
1.
The Integral ventilator can be mounted to
discharge air towards the ceiling. So motor
connector may be located frontwards.
From the inside of the hood, slip motor into
the bracket on the left.
Rotate motor upwards until it snaps into the
spring clip on the right.
Secure the motor to the hood with the
machine screw and lock washer.
Plug connector into the motor, Fig. 11.
From Control
Panel
Motor connector
FIG. 11
manuals search engine
Bracket
Integral ventilator for 40" Hood
Bracket
Motor Connector
Fixing
point
Motor
support
11
10" Duct
Collar
Transition
FIG. 9
Outlet
Spring Clip
Fixing
point
Spring Clip
FIG. 10

Chapitres

Table des Matières
loading

Table des Matières