DCS IVS40 Installation Guide page 11

Table des Matières
Les langues disponibles

Les langues disponibles

3.
Assembly of the 10"Transition.
The transition supplied with the hood mounts to the top
of the hood, Figure 5.
a. Place the transition piece over the hood exhaust
and secure with 4 screws provided.
b. Duct tape connection between transition and
hood.
c. Remove tape holding damper.
4.
Check that the screws on bottom of chimney structure
are partially screwed into place; these will serve to hang
and fix the canopy.
5.
If already mounted in place remove all grease filters.
6.
Back out the hanging screws on the bottom of the
chimney structure to 1/4" gap.
Lift the canopy up to the chimney support .
Carefully align the canopy keyhole to the screws on the
chimney support.
Slide the hood to engage the keyhole slots. See Fig. 6.
7.
Tighten screws securely (from inside the canopy). Fix
canopy to structure with 4 screws from inside the
canopy. See Fig. 7.
8.
Make final angular adjustment to unit at ceiling if necessary, then finish installation adding two
fixing screws. See Fig. 8.
Downloaded from
www.Manualslib.com
Screw
FIG.7
manuals search engine
INSTALLATION
FIG.5
FIG.6
additional
fixing screw
FIG.8
10
Duct
Transition

Chapitres

Table des Matières
loading

Table des Matières