Din Rail Mounting; Wiring - Eaton CHSP Série Instructions D'installation Et D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CHSP Type 1 Surge Protective Devices
2. Thread the lead wires from the SPD through the large hole and
insert the integrated hub into the large hole with the hub pointed
upwards.
3. Use the locknut (provided) to secure the SPD hub to the bracket.

DIN Rail Mounting

1. Attach the DIN rail clip (accessory: SP1DINRAILKIT) to the
bracket using the 3 screws (provided). See Figure 4.
2. Snap the DIN rail clip (provided) into the two smallest holes in the
mounting bracket (provided).
3. Thread the lead wires from the SPD through the large hole in the
bracket and insert the integrated hub into the large hole.
4. Use the locknut (provided) to secure the SPD hub to the bracket.
5. Snap the SPD and bracket to the DIN rail (not provided) with the
hub pointed upwards.

Wiring

imporTanT!
Be sure to follow all U.S. National Electrical Code, state and local
codes, or other applicable country codes.
To avoid fire, shock, or death, turn OFF power at circuit breaker or
fuse and test that power is OFF before wiring.
When connecting the wires from the SPD to the electrical
system, cut the wires as necessary to keep them as short
as possible.
To maximize the SPD's performance, twist and bind the wires
together to reduce the impedance of the wire (one twist / inch).
imporTanT!
1. Locate the electrical system's applicable wiring diagram in Figure
5. Reference this wiring diagram as necessary in Steps 2 and 3.
2. Connect the SPDs neutral wire (white) to the system's
neutral connection.
3. Connect the SPDs phase A, B, and C wires (black) to the
system's corresponding phase A, B, and C connections according
to applicable national, state, and locak electrical codes.
Figure 4. DIN Rail Mounting Kit / Kit de montage sur rail DIN /
Juego de montaje del riel DIN
Instruction Manual IM00404002E
Operation
Power Up and System Checkout
Apply system power. The LED should light.
If the connected LED does not light, remove power, check
connections, and test again. If the LED still does not light, contact
Eaton's power quality technical support at 1-800-809-2772, option 4,
then select option 2.
Routine Operation
After system power has been applied, the SPD automatically begins
to protect downstream electrical devices from damaging voltage
transients.
With all phase voltages present, the LED indicator reports the status
of the protection elements and is active when all of them are intact
and providing protection. Any loss of protection is signaled when the
LED extinguishes.
The device is not repairable and contains no user serviceable parts.
If the unit fails, as evidenced by the LED turning OFF, the unit must
be replaced.
Split Phase
(240S)
Biphasé
(240S)
Fase dividida
(240S)
Grounding and bonding per
national and local electrical codes
Mise à la terre et liaison
conformément aux codes
électriques nationaux et locaux
Puesta a tierra y vinculación de acuerdo
a los códigos eléctricos nacionales y locales
3-Phase Wye
(208Y)
montage en
étoile triphasé
(208Y)
horqueta trifásica
(208Y)
Grounding and bonding per
national and local electrical codes
Mise à la terre et liaison
conformément aux codes
électriques nationaux et locaux
Puesta a tierra y vinculación de acuerdo
a los códigos eléctricos nacionales y locales
Figure 5. SPD Wiring Diagram / Schéma de câblage du
parasurtenseur / Diagrama de cableado del SPD
EatOn COrpOratIOn www.eaton.com
Effective January 2011
PHASE A / PHASE A / FASE A
NEUTRAL
NEUTRE
NEUTRA
PHASE B
PHASE B
FASE B
SPD
PHASE A / PHASE A / FASE A
PHASE B / PHASE B / FASE B
PHASE C / PHASE C
/ FASE C
NEUTRAL
NEUTRE
NEUTRA
SPD
3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Chspt1ultraChspt1maxChspt1microChspt1-208y

Table des Matières