Fantech PBF Série Manuel D'installation Et D'opération page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WIRING
FD 60EM Count-down Timer for Single Location (PB 110 Series)
Ground (bare on GRN)
Neutral (White)
Ground
Neutral
120V AC
Line
Supply
Two Light Switches for Dual Location (PB 270 Series and PB 370-2)
NOTES
1. Order for wires on terminal block may not be as shown
2. Connect Neutral, Line and GRD (if required) to motor colors as shown
3. Cap off Red/Yellow wire on each switch
Terminal
Block on
Green/
Fan
Yellow
Blue
Line In
Black
Fan Motor
Brown
Capacitor
Timer 1
FD 60EM
Red
60M
White
30M
Green
20M
10M
Black
Red/Yellow
Ground (GRN)
Neutral (White)
Line
120V AC
Neutral
Supply
Ground
IPHS5 Humidity Sensor for Single (PB 110 Series)
Ground
Neutral
120V AC
Line
Supply
Terminal
Block on
Green/
Fan
Yellow
Blue
Black
L1
Fan Motor
Brown
Capacitor
Main Light
Switch
Line
Traveler
(Black Lug)
(Brass Lug)
Traveler
Gnd
(Brass Lug)
Terminal
Block on
Green/
Fan
Ground (bare on GRN)
Yellow
Neutral (White)
Blue
Line In
Black
Brown
Capacitor
Sensor 1
IPHS5
Black
White
Green /
Red
Ground
Secondary Light
Switch
Load
Traveler
(Black Lug)
(Brass Lug)
Traveler
Gnd
(Brass Lug)
5
Fan Motor
fantech

Publicité

Table des Matières
loading

Table des Matières