Putting Into Operation; Mounting The Feed Rolls En - Abicor Binzel MF1-Rear Mode D'emploi

Masquer les pouces Voir aussi pour MF1-Rear:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

MF1 rear

6 Putting into operation

Risk of injury due to unexpected start-up
The following instructions must be adhered to throughout all maintenance, servicing, assembly,
disassembly and repair work:
• Switch off the power source.
• Close the gas supply.
• Disconnect the mains plug.
Risk of crushing
Limbs can be drawn in and crushed.
• Do not reach into moving wheels.
NOTICE
• Please take note of the following instructions:
• The system may only be installed and put into operation by qualified personnel (in Germany see
6.1 Mounting the feed rolls
NOTICE
• Ensure that the feed rolls (4), (12) are correctly installed.
• Always replace or reverse the feed rolls (4), (12) in pairs.
• Before installing the feed rolls (4), (12) remove any oil and grease residues from the running surfaces.
• Pay attention to the groove geometry and wire diameter; use smooth feed rolls only as
• All grooved feed rolls (4), (12) have two guide grooves. Should one be worn out, the roll can be
• Adjust the contact pressure using the pressure screw (8).
• When assembling the pressure rocker (10) make sure that the axles (9) (anti-twist protection pin) are
• Check that the pressure rolls (12) run smoothly once installed.
• Ensure that the knurled screws are correctly assigned/installed in the correct position:
DANGER
WARNING
 3 Product description on page EN-6
TRBS 1203).
pressure rolls (12).
reversed once and re-used.
positioned in the lower longitudinal groove.
• Red knurled screws (7) = pressure rocker
• Blue knurled screws (3) = gear side
6 Putting into operation
EN - 9

Publicité

Table des Matières
loading

Table des Matières