Télécharger Imprimer la page

Wallbox Power Boost Guide D'installation page 16

Masquer les pouces Voir aussi pour Power Boost:

Publicité

POWER METER INSTALLATION
Installation
9.1. Select GO.
9.2. On the Systems screen, scroll down to 2P and press
Enter.
9.3. Continue to the Ct rAt Menu
9.4. Press OK.
9.5. Set the Ct rAt value up to 50, so that it matches
with the 250 A clamps supplied.
9.6. The meter has been successfully configured.
16

Publicité

loading

Ce manuel est également adapté pour:

Eco-smart