VEVOR RF-RY-029 Manuel D'instructions page 92

Table des Matières
STEP 5:Same as step 4, install the orifice and mesh.
STEP 6:The longest horizontal bar is mounted on the uppermost layer,
with three screws fixed. The other two horizontal bars are installed in
the lower layer,as shown in the figure, and the left and right two
screws are fixed.
- 6 -
Table des Matières
loading

Table des Matières