Before You Install - Flo Home X5 Guide D'installation

Masquer les pouces Voir aussi pour Home X5:
Table des Matières
Les langues disponibles

Les langues disponibles

Before You Install

IMPORTANT CONSIDERATIONS WHEN INSTALLING THE STATION
The station must be installed by a certified electrician.
The station has built-in protection against overvoltage conditions and leakage current to
ground.
Any alteration to any part of the charging station will void the warranty.
Connecting your new charging station requires:
-
Single-Phase 120/240 VAC supply (figure 1) or 3-Phase 120/208 VAC supply (figure 2)
-
Using 6 to 8 AWG copper conductors
-
Protection by a two-pole 40A circuit breaker
-
2 phases and a ground connection with 120 VAC between each phase and ground
NOTE: neutral is not required.
Maximum output power: 7.2 kW @ 240 V or 6.2 kW @ 208 V
Figure 1
Single-Phase 120/240 VAC
Figure 2
3-Phase 120/208 VAC
FLO Home X5 | Installation guide |
120
VAC
Neutral
120
VAC
Ground
A
Neutral
C
B
Ground
fl
o.com | December 2022
L1
240
Charging
Station
VAC
L2
Ground
L1
208
Charging
VAC
Station
L2
5

Chapitres

Table des Matières
loading

Table des Matières