Télécharger Imprimer la page

Zephyr Brisas BML Island Guide D'utilisation, D'entretien Et D'installation page 14

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
Mounting the Hood
CAUTION
Hood is intended to be mounted to a finished
Ceiling Preparation
1. Determine hood mounting location and
temporarily tape paper template (included with
the hood) to the ceiling.
2. Cut-out internal shaded area of template
to allow the ducting and electrical to pass
through (approx. 7"W x 7-1/2"D).
3. Add wood blocking (min. 2" x 4") onto ceiling
joists to reinforce ceiling above the drywall.
(FIG. C1).
4. Secure (2) #6 x 1-1/2" wood screws into points
A and B of the paper template (FIG. B). Do not
completely tighten screws, leave approximately
1/4" exposed.
Hood Preparation
5. Remove screws securing top and bottom
support frames together.
6. Adjust support frame to accommodate the
desired hood height and re-assemble the frame
using the previously removed screws (2 screws
for each support frame arm). (FIG. C2).
14
ceiling.
Front of Hood
Cut-Out Shaded Area
A
FIG. B
Ceiling Joists
Wood Blocking
Top Support Frame
Bottom Support Frame
Hood Body/Canopy
FIG. C
BML-C Use, Care, and Installation Guide
B R I S A S
I S L A N D
C L
B
1
3
2
B M L
4

Publicité

loading

Ce manuel est également adapté pour:

Brisas bml-e30cgBrisas bml-e36cg