Startup; Max. Capacity Line; Lock - Diamond Bvl030P/R6 Mode D'emploi

Table des Matières
Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20

Startup

Clean the cabinet before use. See section on maintenance.
Important note:
If the cabinet has been lying down during transport, wait 2 hours before starting.

Max. capacity line

The cabinet has a line marked inside which indicates the maximum level to which it can be filled.
See fig. 1.2.

Lock

The cabinet has a lock which can be fitted to the lids. See fig. 1.3.
Fig. 1.2
Fig. 1.3
10
Table des Matières
loading

Ce manuel est également adapté pour:

Uss300y-ysc-sdUss300sd-i

Table des Matières