Storage; Requirements To Be Met Before Installation - Honeywell QA Mode D'emploi

Compteurs de gaz à turbine et quantomètres
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 63
Scope of delivery for QA..Z, QAe..Z
a. Ordered measuring instrument
b. 8 hexagon screws and nuts
QA..Z, mechanical index:
c. 2 plugs for pulse generators
QAe..Z, electronic index:
c. 1 plug for pulse generator
Plug for pulse generator
Available as an option for QAe...Z:
d. M-BUS/L-BUS

3.2 Storage

 Store the device in a dry and dust-free location.
 Avoid constant direct sunlight.
 Store the device in its original packaging.

3.3 Requirements to be met before installation

 Remove sealing caps and foils in full. There must be no residue left on
the flow body.
 Check the meter and accessories for signs of transport damage.
 Check that the turbine moves easily by generating a gentle air current.
 Ensure that you have all the tools you require available.
 Check that the accessories are complete.
 Seals which are suitable for your operating medium.
 Please also check whether you must comply with other standards, e.g.
DIN EN 1591, Parts 1 – 4.
73025026a
© Elster GmbH | All rights reserved. Subject to modification
Fig. 4 | Scope of delivery for QA..Z, QAe..Z
Honeywell
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Qae

Table des Matières