INSTALLATION REQUIREMENTS
TOOLS AND PARTS
Gather the required tools and parts before starting installation.
Tools needed for all installations:
Parts supplied (ail models):
Flat-blade screwdriver
#2 Phillips screwdriver
Leveling legs (4)
Parts supplied (steam models):
STe—s
[oso
1/4" and 5/16" nut driver
Level
(recommended)
~~
——
'
03
\__
a
Tape measure
Pliers
C=
TS
Utility knife
q
Caulking gun and compound
(new vent installations)
Adjustable wrench that opens to
1" 25 mm) or hex-head socket wrench
Tools needed for gas installations:
i
8" or 10" pipe wrench
Pipe-joint compound
resistant to LP gas
4
8" or 10" adjustable wrench
(for gas connections)
"Y¥" connector
Parts package is located in dryer drum. Check that all parts
are included.
NOTE: Do not use leveling legs supplied with dryer if installing
with a pedestal or a stack kit.
Parts needed: (Not supplied with dryer)
@ Vent clamps
@ Vent elbows and vent work
Parts needed (steam models):
5' (1.52 m) inlet hose
and rubber washer
2' (0.6 m) inlet hose
Additional parts may be required, depending in your installation.
Check local codes. Check existing electrical supply and venting.
Read "Electrical Requirements" and "Venting Requirements"
before purchasing parts.
Optional Equipment: (Not supplied with dryer)
Refer to your "Use and Care Guide" for information about
accessories available for your dryer.