Télécharger Imprimer la page

Tuzio H93303 Guide D'installation page 3

Publicité

Rough In - Dedicated Heating System
STEP 1
Rough-in Requirements for Dedicated Circulation Heating System (see figure 2)
Using this installation method, the towel warmer is controlled
using the thermostat wired to the circulator pump, and cannot be
operated independently from the heating system. This method of
installation is popular where there is only one heating appliance
connected to a closed hot water heating system, and electronic
control of the individual towel warmer is required.
1. Install heating system pipework to proposed towel warmer
location. Piping to towel warmer valves should be 1/2"
copper.
2. If towel warmer supply pipes are coming through wall,
rough-in pipes as per locations shown on fig 4. If towel
warmer supply pipes are coming through floor, rough-in
pipes as per locations shown on fig 7.
3. If a hydronic installation pack is being used (see figs 5 & 8),
these should be connected (solder connected) within the wall
/ floor. If a hydronic installation pack is not being used (see
figs 6 & 9), these 1/2" copper supply lines should protrude
through wall/floor in order to connect to towel warmer
valves.
4. Wall studs or plywood backing is required in the wall at all
bracket locations. See figure 4 for bracket locations.
Figure 2
877-757-8930
www.icobath.com

Publicité

loading

Ce manuel est également adapté pour:

H93305