Télécharger Imprimer la page

Danby DKC052BSL2DB Guide D'utilisation Et D'entretien page 13

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
Opening the CO
Make sure the secondary shut-off valve (shown in Fig. 9 in "open" position) is closed. To open the main CO
valve, slowly turn the main valve counter-clockwise until fully open.
Notice the needle on the regulator gauge start to climb.
Adjusting the CO
The gauge (closest to the CO
psi (see Fig. 10). The pressure can be adjusted as needed.
Release adjustment lock nut marked 2.
Turn regulator nut marked 3.
- To increase pressure, turn nut clockwise.
- To decrease pressure, turn nut counter-clockwise.
Retighten lock nut marked 2.
Open secondary shut off valve to let CO
Allow several minutes for the keg to properly pressurize. Regulator gauge may drop while this happens. (Note: Listen
for hissing along all connections to identify if there are any leaks).
Rubber washer goes
here
Fig. 7
Spanner Faucet Wrench (Included)
Spanner faucet wrench (provided) is for either removing or tightening the connection.
Note: To prevent leakage, use the provided wrench to further tighten the faucet.
All manuals and user guides at all-guides.com
Cylinder Main Valve
2
Regulator
2
cylinder) monitors low internal keg pressure and should be adjusted to read between 8-12
2
fl ow into the keg.
2
IMPORTANT: Please put
rubber washer on the
coupler to avoid any
leaks.
Fig. 8
Fig. 9
Fig. 9
Fig. 9
10
cylinder
2
Fig. 10
Fig. 10

Publicité

loading