Les langues disponibles

Les langues disponibles

Liens rapides

Notice to Installer: Instructions must remain with installation.
Trusted. Tested. Tough.
Product information presented here reflects conditions at time of publication. Consult factory regarding discrepancies or inconsistencies.
MODELS 104*, 105, 106, 110, 115, 120, 131
MEETS UPC
COMPLIES WITH ASME A112.3.4
AND CSA B45.9.
* MODEL 104 IS NOT
UPC APPROVED.
1. Inspect your unit. Occasionally, products are damaged during shipment. If the unit is damaged, contact your dealer before using. DO NOT remove
the test plugs from the pump.
2. Carefully read the literature provided to familiarize yourself with specific details regarding installation and use. These materials should be retained for future reference.
SEE BELOW FOR LIST OF WARNINGS
1. To reduce the risk of electrical shock, a properly grounded receptacle
of grounding type must be installed and protected by a ground fault
circuit interrupter (GFCI) and in accordance with National Electrical
Code and local codes. (SEE WARNING BELOW)
2. Make certain that the receptacle is within the reach of the pump's
power supply cord. DO NOT USE AN EXTENSION CORD. Extension
cords that are too long or too light do not deliver sufficient voltage
to the pump motor. But more important, they could present a safety
hazard if the insulation were to become damaged or the connection
end were to fall into the sump.
3. Testing for Ground. As a safety measure, each electrical outlet should
be checked for ground using an Underwriters Laboratory Listed circuit
analyzer which will indicate if the power, neutral and ground wires
are correctly connected to your outlet. If they are not, call a qualified
electrician.
4. For Added Safety. Pump must be connected to a 3-prong grounded
outlet interrupter device (ground fault circuit interrupter).
5. FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP FROM ITS
POWER SOURCE BEFORE HANDLING. Single phase pumps are supplied
with a 3-prong grounded plug to help protect you against the possibility
of electrical shock. DO NOT, UNDER ANY CIRCUMSTANCES, REMOVE
THE GROUND PIN. To reduce the risk of electrical shock, a properly
grounded receptacle of grounding type must be installed and protected
by a ground fault circuit interrupter (GFCI) in accordance with national
electrical code and local codes.
6. Installation and checking of electrical circuits and hardware should
only be performed by a qualified licensed electrician.
7. Risk of electric shock - These pumps have not been investigated for
use in swimming pool areas.
8. Prop65 Warning for California residents:
: Cancer and Reproductive Harm-
www.P65Warning.ca.gov.
®
MAIL TO: P.O. BOX 16347 • Louisville, KY 40256-0347
SHIP TO: 3649 Cane Run Road • Louisville, KY 40211-1961
Tel: (502) 778-2731 • 1 (800) 928-PUMP
DRAIN PUMP SYSTEMS
INSTALLATION INSTRUCTIONS
© Copyright 2023 Zoeller
CAUTION
SEE BELOW FOR LIST OF CAUTIONS
1. Check to be sure your power source is adequate for handling the
voltage requirements of the motor, as indicated on the pump or basin
plate.
2. Make sure the pump electrical supply circuit is equipped with fuses
or circuit breakers of proper capacity. A separate branch circuit is
recommended, sized according to the National Electrical Code for
the current shown on the pump name plate.
3. All plumbing (discharge and vent lines) must be installed to meet local
codes. Unit must be vented. DO NOT USE AN AUTOMATIC PLUMBING
VENT DEVICE SIMILAR TO A "PRO-VENT". Some states require this
product to be installed by a licensed plumber.
4. Repair and service should be performed by Zoeller Pump Company
Authorized Service Station only.
5. CHECK VALVE MUST BE USED TO REDUCE UNNECESSARY CYCLING
OF PUMP. Check valve must be purchased separately on model 104
only.
6. Dewatering pumps are not designed or intended for handling raw
sewage.
7. Maximum operating temperature for 105-131 Drain Pumps must not
exceed 130 °F (54 °C). 104 Drain Pumps are not to exceed 110 °F (43
°C).
8. For health reasons, do not unplug, turn off, or disable pump and use
pump tank system as a way to fill up a sink or laundry tray, etc.
9. Unit is designed for above ground installation only.
Pumps with the "UL" mark and pumps with the "US" mark are tested to
UL Standard UL778. CSA Certified pumps are certified to CSA Standard
C22.2 No. 108.
REFER TO WARRANTY ON PAGE 2.
Co. All rights reserved.
®
1
FM2336
Supersedes
Visit our website:
zoellerpumps.com
MODEL: ______________________
DATE CODE: __________________
DATE INSTALLED: _____________
0823
1221
Table des Matières
loading

Sommaire des Matières pour Zoeller 104

  • Page 17: Voir Plus Bas Pour La Liste Des Avertissements

    7. La température maximale de service des pompes de vidange 105-131 ne doit L’ALIMENTATION DE LA POMPE AVANT TOUTE INTERVENTION. Les pompes pas dépasser 54°C (130°F). Les pompes de vidange 104 ne doivent pas dépasser monophasées sont fournies avec une fiche à trois broches pour fournir la 43 °C (110 °F).
  • Page 18: Garantie Limitée

    Serrer avec précaution tous les joints (utiliser de la pâte à joint) et les vis. Vérifier la position du joint, serrer uniformément le couvercle. Ne pas trop serrer les raccords ni les vis. Si la liste de vérification ci-dessous ne permet pas de résoudre le problème, veuillez vous adresser à l’usine. N’essayez pas de réparer ni de démonter la pompe. L’entretien doit être effectué par un centre d’entretien et de garantie autorisé Zoeller. Consulter le site www. zoellerpump.com afin de trouver un centre d’entretien autorisé dans votre région. © Copyright 2023 Zoeller Co. Tous droits réservés. ®...
  • Page 19: Dix Conseils Pour Faciliter L'installation

    105/106 MODÈLES 110/115/120 PIEDS Meters Gal. Litres Gal. Litres Gal. Litres Shut-off Head: 5,5 m (18 pi) 19.25 ft. (5.9m) 23 ft. (7.0m) 105/106/110 /115/120 GALLONS LITRES DÉBIT PAR MINUTE 009898AF © Copyright 2023 Zoeller Co. Tous droits réservés. ®...
  • Page 20: Détermination De La Configuration De L'installation

    LES COMPOSANTS DU SIPHON INTERNE SONT FOURNIS PAR DES TIERS. LES TUYAUX SONT MONTRÉS POUR CLARIFIER 100 mm (4 po) VOIR REMARQUE Figure 1.1A SIPHON INTERNE LES TUYAUX SONT MONTRÉS POUR CLARIFIER Figure 1.1B STANDARD (SIPHON EXTERNE) SK2001F © Copyright 2023 Zoeller Co. Tous droits réservés. ®...
  • Page 21: Montage Du Tuyau De Refoulement Sur La Pompe (Tous Les Modèles)

    Installer le joint dans le siège de joint en haut de la S'ASSURER QUE LES ENCOCHES cuve, voir les détails à la figure 3.1. SONT ALIGNÉES JOINT DETAIL DE JOINT CUVE Figure 3.1 SK2003F © Copyright 2023 Zoeller Co. Tous droits réservés. ®...
  • Page 22: Installation Du Siphon Interne Uniquement

    Remarque – Pour assurer une bonne fermeture, il faut installer la rallonge comme montré dans le « détail du siphon ». LES COMPOSANTS DU SIPHON INTERNE SONT FOURNIS PAR DES TIERS. Figure 4.1 Figure 4.2 Figure 4.3 SK2004F © Copyright 2023 Zoeller Co. Tous droits réservés. ®...
  • Page 23: Montage Final

    *CLAPET DE RETENUE INSTALLATION STANDARD NON INCLUS AVEC LE Figure 5.3A Figure 5.3B MODÈLE 104 et 132-0005. SK2006F SK2006F ÉTAPE 6 Essai initial du système de cuve de vidange 6.1) Brancher le cordon dans une prise correctement à la terre avec disjoncteur différentiel.
  • Page 24: Liste Des Pièces Illustrées

    - 20 et (16) rondelles plates 1/4 po en acier inoxydable avec (1) bouchon d'extrémité de tuyau et (1) joint torique. MODÈLES 105/110/115/120/131 MODÈLE 1104 MODEL 105/106/110/115/120/131 MODEL 1104 CLAPET ANTIRETOUR (ACHETÉ SÉPARÉMENT) SK2008 SK2008 Il s'agit ici d'une traduction des instructions d'origine. © Copyright 2023 Zoeller Co. Tous droits réservés. ®...

Ce manuel est également adapté pour:

105106110115120131

Table des Matières