3.1.
INSTALLATION
Selection of Installation Position Select a place for installation which can meet the Following
conditions.
- a place that described in "Before Installation of this manual".
- a place in a metallic cabinet which is grounded and is shut tightly.
3.2.

INSTALLATION PROCEDURES

- Install the HARC70-CE1 (OP) by keeping the screw terminal board at the lower side.
Upper
Screw Terminal
Lower
- Installation methods are as follows:
a) Mounting on DIN Rail (35mm) (DIN Rail: Field-Supplied)
Procedure:
1. Hook the edge of the HARC70-CE1 (OP)
at theUpper part on the DIN Rail.
2. Press the another edge to the railuntil
the HARC70-CE1 (OP) is fully fixed.
INSTALLATION WORK
Correct Installation
HITACHI CONTROL
SYSTEM G/W
/
5
3
Wrong Installation
(Horizontal Installation)