7) Another installation procedure using height:
As shown, Fix top pole (W) and bottom pole (Y) together by
2 pcs of bolt (F).
After that, fix the triangular fixed block (AA) on the bottom
pole (Y) with screws (F1), and finally fix the lifting rod (BB)
and triangular fixed block (AA) with screw (E).
1
14
2
AA
3
8) Install the ball net
M
L
If the product does not need to be moved frequently, we
recommend filling the base with sand instead of water.
Because water freezes below 0
base. Note, however, that the sand can not be poured out
after being loaded into the base. In order to be more stable,
it is recommended to place heavy objects in the
counterweight bag (DD) on the base.
Sand
90% Water
DD
Place the counterweight bag after filling with sand.
C (32
F), it can damage the
o
o
Cover cap
15