Télécharger Imprimer la page

Faro Barcelona Heywood Guide D'installation page 8

Publicité

ompose Drown rod
Pass the cable through the down rod and
Step 1(Basic assembly of the fan)
lock the down rod.
Decompose Drown rod
Install the Yoke cover and Canopy. Then
insert the fixing pin, push the Hanging ball
up, and fix it with screws.
1
OK
all the Yoke cover and Canopy. Then
all
rt the fixing pin, push the Hanging ball
and fix it with screws.
4
Pass the cable through the down rod and
Assembly Instructions
lock the down rod.
Pass the cable through the down rod and
lock the down rod.
screw
OK
2
Step 2 (Ceiling bracket installation and fan into the installed Bracket.)
Step 2 (Ceiling bracket installation and fan into the installed Bracket.)
OK
5
Click!
buckle
screw
screw
Assembly Instructions
Assembly Instructions
Step 3 (Receiver installation and wiring)
Turn off the fan power supply at the circuit
Turn off the fan power supply at the circuit
breaker box and the wall switch. If it is a
breaker box and the wall switch. If it is a
cement roof, please drill the installation
cement roof, please drill the installation
Connect the wires according to the polarity (the color of th
hole at the installation location.
hole at the installation location.
House power cord may be different if the color is the same
AC IN N(Blue)
OFF
AC IN L(Brown)
OFF
Ground(Yellow/green)
Snap the basically assembled fan into the
installed Bracket.
Snap the basically assembled fan into the
installed Bracket.
Click!
AC IN N(Blue)
AC IN L(Brown)
Ground(Yellow/green)
FAN
3
Can be installed on <15º sloped roof.
Can be installed on <15º sloped roof.
Choose the following installation methods
Choose the following installation methods
according to the actual situation of the roof.
according to the actual situation of the roof.
or
or
L For light(Blue)
N Neutral(White)
6
8
Cement roof
Cement roof
House powe
To Motor
Solid wood roof
U(Pink)
Solid wood roof
V(Gray)
W(Red)

Publicité

loading