Les langues disponibles

Les langues disponibles

H-10735
STAINLESS STEEL EYEWASH STATION
TOOL NEEDED
Strap Wrench
NOTE: The use of a vice is recommended for
proper tightening and alignment.
IMPORTANT! All threads are tapered pipe and
require pipe joint compound or Teflon® tape to
ensure watertight connection. When securing
with Teflon® tape, wrap tape around each
thread 10-12 times for optimal seal.
1.
Wrap Teflon® tape around threading of base
support unit (A).
2. Unscrew bottom connection pipe (B) from the
tee-joint. Wrap Teflon® tape around threading on
both ends and reassemble.
3. Connect bottom connection pipe (B) to the base
support unit (A).
4. Connect the eyewash basin drain set (C) to bottom
connection pipe (B).
5. Wrap Teflon® tape around threading on both ends
of the middle connection pipe (F).
6. Connect middle connection pipe (F) to the eyewash
basin drain set (C).
7.
Unscrew top connection pipe (G) from the two
tee-joints. Wrap Teflon® tape around all threading
and reassemble.
8. Connect the top connection pipe (G) to the middle
connection pipe (F).
9. Unscrew all four pieces of the shower connecting
pipe set (J). Wrap Teflon® tape around threading of
both pipes on both ends and reassemble.
10. Take the shower connecting pipe set (J) and
connect to the side of the top tee-joint. Ensure the
square head plug is on top.
11. Attach the stainless steel pull rod (H) to the arm of
shower ball valve (I).
12. Wrap Teflon® tape around threading of the shower
head (K).
PAGE 1 OF 9
1-800-295-5510
uline.com
ASSEMBLY
Figure 1
K
Figure 2
M
D
Para Español, vea páginas 4-6.
Pour le français, consulter les pages 7-9.
Square
Head Plug
I
Elbow
J
Pipe
H
L
C
Tee-Joint
1222 IH-10735
G
F
E
B
A
Table des Matières
loading

Sommaire des Matières pour Uline H-10735

  • Page 7: Douche Oculaire En Acier Inoxydable

    H-10735 1-800-295-5510 uline.ca DOUCHE OCULAIRE EN ACIER INOXYDABLE OUTIL REQUIS Clé à sangle MONTAGE REMARQUE : L'utilisation d'un étau est recommandée pour obtenir un serrage et un Figure 1 alignement adéquats. Bouchon à tête carrée IMPORTANT! Tous les filetages de tuyau sont de Tuyau type conique et nécessitent l'utilisation de pâte...
  • Page 8: Montage Suite

    MONTAGE SUITE 10. Prenez l'ensemble de tuyaux de raccordement de la douche (J) et raccordez-le sur le côté du raccord en T supérieur. Assurez-vous que le bouchon à tête carrée se trouve sur le dessus du raccord. 11. Fixez la tirette en acier inoxydable (H) au bras du robinet à...
  • Page 9 11 ½ po Fentes de fixation 44 po de 5/16 po Sortie NPT de 1 ¼ po 6 ¼ po 8 po Cette douche est conforme aux exigences de la norme ANSI Z358.1. 1-800-295-5510 uline.ca PAGE 9 OF 9 1222 IH-10735...

Table des Matières