Télécharger Imprimer la page

Barrette Y-Latch Instructions D'installation page 4

Publicité

Les langues disponibles

Les langues disponibles

WALK GATE INSTALLATION
1.
Determine Gate Opening:
Determine the gate opening by adding the width of
the gate plus clearance of hinges plus a clearance
distance of 1-3/4" to 3" for the Y-latch.(See hinge
instructions for clearance details.)
NOTE:
Mount gate on hinges prior to installing the
Y-latch.
2.
Attach Y-Latch to Fence Gate:
a. For walk gates utilizing 2" gate uprights and
2" post uprights, the Y-latch can be installed
in the same method as the double drive gate
installation (Fig. 5).
b. For walk gates utilizing 2" gate uprights and
2½" post uprights, the post will serve as the
Y-latch swing arm stop.
NOTE:
Do not install the stop bracket because it will
not fit on post upright (Fig. 6).
PADLOCK OPTIONS
1.
Fig. 3, 4 and 5 Y-latch installation should use
padlock option 1 shown in Fig. 7.
2.
Fig 6 Y-latch installation should use padlock option
2 shown in Fig. 7.
4
Gate
Upright
Post
Upright
Gate
Upright
Post
Upright
Padlock Option 1
Padlock Option 2
Fig. 5
Fig. 6
Fig. 7

Publicité

loading