Télécharger Imprimer la page

ascon C Serie Instructions D'installation page 26

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
When removing the LCD panel from the bracket,
Step 1
Remove the LCD panel
from the bottom part first
with help of a screw driver
1. A 3V DC battery is supplied with the LCD. It is used to ensure that the LCD displays real time once the timer is set.
2. The LCD is wired to the main board via CN8 connection. (This is factory installed)
If the wiring between the LCD and PCB must be longer, an alternative is used. Use a 4-core wire of the desired length and
connect this wire between the terminal block CN2 on the LCD to the terminal block CN5 on the PCB. Ensure that the
correct wire terminals are connected.
3. Networking between chillers can be carried out. Connect the wire as shown
Servicing
Servicing or maintenance of these units must be carried out by experienced personnel with specific training in refrigeration.
Repeatedly check the safety devices and continuous cycling of control components. These items must be analyzed and
corrected before being reset.
The simple design of the refrigeration circuit totally eliminates potential problems during normal unit operation. No mainte-
nance work is needed on the refrigeration circuit as long as the unit is operating normally.
Ease of maintenance has been taken into consideration during the design stage such that the unit is easily accessible from the
service panels. The electrical components are especially easy to access since it is located in the terminal box in the front
service panel (Figure 7).
All manuals and user guides at all-guides.com
Factory installed
Main Board Unit 00
A
B
12V
JP13
GND
A
Alternative wiring between LCD panel and PCB
CN5
A
B
12V
For networking only
GND
PCB Unit 01
SERVICING AND MAINTENANCE
Figure 7
1-13
Step 2
Remove the
LCD panel
LCD Panel
CN8
CN2
B
12V
GND

Publicité

loading