Télécharger Imprimer la page

Gazebo Penguin 7170047 Manuel D'instructions

Abri double de luxe

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

MANUEL D'INSTRUCTIONS
INSTRUCTION MANUAL
ABRI DOUBLE DE LUXE
DELUXE DOUBLE CAR SHELTER
item #7170047
item #7170048
item #7170049
sku: SCOC 20X20X7'6FF
sku: SCOC 20X25X7'6FF
sku: SCOC 20X30X7'6FF

Publicité

loading

Sommaire des Matières pour Gazebo Penguin 7170047

  • Page 1 MANUEL D’INSTRUCTIONS INSTRUCTION MANUAL ABRI DOUBLE DE LUXE DELUXE DOUBLE CAR SHELTER item #7170047 sku: SCOC 20X20X7’6FF item #7170048 sku: SCOC 20X25X7’6FF item #7170049 sku: SCOC 20X30X7’6FF...
  • Page 2 ÉTAPES 1. ARCHES CENTRALES a) Prendre une arche centrale (F) et assemblez à chaque bout une extension (E). Notez que l’extension (E) a un trou qui est à 6” d’une des extrémités; cet extrémité est pour le coin d’arche, et non l’arche centrale. b) Sur chacune des autres extrémités des extensions (E), installez un coin d’arche principal (H).
  • Page 3 ÉTAPES 4. ASSEMBLAGE DES STRUCTURES a) Prendre 2 pattes à 2 trous (I) et les installer sur l’arche du bout avec le rail de porte. b) Prendre 2 pattes à 1 trou (J) et les installer sur l’arche régulière. c) Placer l’arche du bout debout à l’intérieur de la structure et attacher les entretoises males (10-367) à...
  • Page 4 ÉTAPES 5. INSTALLATION DU TOIT (Les attaches à l’intérieur) a) Mettre la toile devant l’abri tel qu’illustré. b) Dépliez la toile tel qu’indiqué et la monter sur l’abri tel quel. c) La partie avant du garage est avec des fenêtres. d) Assemblez le toit sur la structure de l’abri en vous assurant que le triangle soit à...
  • Page 5 SCHÉMA - SCHEMA...
  • Page 6 STEPS 1. CENTER ARCHES a) Take one center arch (F) and assemble at each end an extension (E). Note that extension (E) has a hole at 6” from one end, this endgoes into the corner arch, not the center arch. b) At each end of (E), install one corner arch 1 hole (H).
  • Page 7 STEP 4. ASSEMBLY OF STRUCTURES a) Take 2 legs with 2 holes (I) and install them on the end arch. b) Take 2 legs with 1 hole (J) and install them on the regular arch. c) Place an end arch upright with the rail door inside the structure and attach male braces (10-367) at each hole inside the shelter with 4”...
  • Page 8 STEP 5. COVER INSTALLATION a) Place cover in front of the completed structure as shown in schema. b) Unfold the cover as shown and place it onto the structure. c) The front of the shelter is the side with windows (1 on the left. 1 on the right, if included). d) Assemble roof on the structure making sure that the triangular corner is at the front.
  • Page 9 LISTE DE PIÈCES - PARTS LIST QTÉ/QTY Pièce # Description Part 20’ 25’ 30’ 98-188 Rail de porte Door Rail 93-481 Jonction rail de porte Door rail junction 95-263 Retenu pour rail de porte Door rail holder 93-185 Renfort d’arche Crossbar 93-178 Extension...
  • Page 10 LISTE DE PIÈCES - PARTS LIST QTÉ/QTY Pièce # Description Part 20’ 25’ 30’ Crochet pour rail de porte 01-357 Door Rail Hook Clou 90-012 Nails Crochet de plancher 90-013 Floor Brackets Elastique + crochet ‘’S’’ 90-014 Elastic + S-Hook Noix papillon 90-019 Wing nuts...
  • Page 11 7. Le produit ne sera garanti que s’il est installé conformément aux instructions écrites de Gazebo Penguin incluses avec le produit.
  • Page 12 • 2 YEARS FOR THE CANVAS • 5 YEARS FOR THE STRUCTURE In the event that the product is damaged or the warranty period has expired, please contact Gazebo Penguin’s Customer Experience Department for a complete list of replacement parts and prices.