Télécharger Imprimer la page

Gazebo Penguin 7170041 Manuel D'instructions page 6

Abri d'auto suprême

Publicité

Les langues disponibles

Les langues disponibles

STEPS
5. COVER INSTALLATION (Ties are always on the inside)
a) Place the roof in front of the shelter as illustrated.
b) Unfold as illustrated then lift onto shelter as is.
c) Place cover over the completed structure making sure that the triangle is at the front of the shelter.
d) Attach all the straps inside of the roof around the structure poles going completely around the shelter.
e) Tie inside ties firmly to pipes.
f) Grommets are placed in the upper corner of each door. Put the cord through these grommets and secure
to the ground with nails.
6. DOOR ASSEMBLY
a) Take one door with shiny side facing outside placing on to hooks (M).
b) Repeat a) for the remaining doors.
c) Take an elastic, put through one of the grommet holes on the door from the inside out. Take S hook,
place it on the elastic and squeeze one end with a pair of pliers so it locks on the elastic. Repeat until
all the elastics are done, and then use the open end to hook on the grommet band on the side of the roof.
7. SHELTER REINFORCEMENT
a) Place your shelter in the final position you want then close the front and back doors (if supplied)
before anchoring, anchor with brackets (K) and nails (J) as per diagram.
b) Fix flap to your house (if applicable). The structure has to be anchored on a flat leveled surface as asphalt,
concrete, etc. Additionnal anchors are not included.
STEP 5
STEP 6
STEP 5
STEP 7

Publicité

loading