Télécharger Imprimer la page

Tectro R236 Manuel D'utilisation page 75

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
STEP 17
STEP 18
STEP 19
STEP 21
STEP 23
M
STEP 2
15. Reposition 4 wing nuts on the mounting stud, but do
16. Raise the wick to its highest position and tighten the
17. Check the wick height. It should be 5/16 inch above the
18. Check for the correct clearance between wick holder
19. Reinstall the tip-over switch assembly by pushing the
20. Check the function of the tip-over safety stop by push-
STEP 16
21. Reinstall the automatic ignition assembly.
22. Reinstall the wind cover A / B.
23. Reinstall the ignitor coil K.
24. Reinstall the cabinet .
25. Tighten the 5 screws on the cabinet and reinstall the
26. Reinstall the combustion chamber 4 and the fuel tank
27. Reinstall the knurled wick adjustment knob 2. Close
STEP 20
STEP 20
Install the batteries in the battery case and fill the fuel tank
with Premium Quality Fuels. Put the tank into the heater
and wait at least 30 minutes for the new wick to fully satu-
rate with the fuel.
STEP 22
H
STEP 3
not tighthen them.
wing nuts in several steps.
collar.
and draft tube. It should be the same all around.
extinguish knob .
ing the extinguish button  to activate the pendulum.
sensor at the back of the cabinet .
.
the front plate.
4
75

Publicité

loading

Produits Connexes pour Tectro R236